6.4 · Checklists & templates

Level 6 · In Practice

6.4Checklists & templates

Goal: have operational checklists to frame a project and move an automation into production.
Estimated time: 14 min · If you only have 5 min: read “The essentials in 30s” + the diagram.

The essentials in 30 seconds

  • Before launching: framed process, classified data, right tool per link, modelled base, identified quick win.
  • Before producing: real test, early filter, encrypted secrets, retry + alert, doc and ROI.
  • Rule: a checklist ticked every time beats a method known by heart — in a rush, you execute.

Lina thread — the sheets at hand

After one year, both sheets below are displayed at Lina’s desk: the pre-project one next to her screen, the production one in her drawer with the contact’s details. “What saved me,” she says in substance, “is not knowing the points, it is ticking them every time — especially in rush weeks.”

Adapt the wording to your context, keep the structure: it is what prevents omissions and incidents.

Two lists to keep at hand

One checklist before launching a no-code project, one before moving an automation into production. They turn good reflexes into a verifiable routine.

Before launching a no-code project

  • The process is framed: trigger, clear rules, current time, good candidate (stable, repetitive).
  • Data is classified by sensitivity (public / internal / personal) and hosted in the right place.
  • The right tool is chosen for each link (organise / structure / connect / create / collect).
  • The base is modelled cleanly (one table per entity, typed fields, relations) before any app.
  • A quick win is identified to start with (high impact, low effort).

Before moving an automation into production

  • The scenario has been tested with real data and the mapping checked.
  • A filter is placed early to process only what is useful (controlled operations).
  • Secrets (API keys) are encrypted, with minimal rights — never in plain text.
  • Error handling is in place: retry, fallback, alert (never a silent failure).
  • The workflow is documented (role, trigger, owner) and the ROI estimated.
Common misinterpretation: «collecting checklists». No. A checklist is only useful ticked and used: take the one for your next project, the others will wait.
Text version of the diagram (SEO / screen readers / translation): Two moments, two sheets: 1) Pre-project — frame, classify data, choose the tool, model, target a quick win. 2) Pre-production — test in real conditions, filter early, encrypt secrets, retry + alert, document and quantify ROI. Lesson: under pressure you no longer think, you execute the sheet.

Ready-to-say script — validating a production release (30 s)

«Tested with real data and mapping checked? Early filter placed? Secrets encrypted with minimal rights? Retry, fallback and alert in place? Doc and ROI noted? If any no, we do not move into production.»

Copy-paste template — project + production tracking (1 line per point)

PROJECT of ...: process framed (trigger, rules, time): OK / to redo
DATA classified by sensitivity + hosting: OK / to redo
TOOL per link + base modelled before the app: OK / to redo
QUICK WIN identified: OK / to redo
PRODUCTION: real test + mapping checked: OK / to redo
Early FILTER placed: OK / to redo
SECRETS encrypted, minimal rights: OK / to redo
RETRY + fallback + alert: OK / to redo
DOC (role, trigger, owner) + ROI: OK / to redo

VSE / small budget

Sheets on one page posted on the wall: the essentials (frame, link, filter early, secret, alert) are enough.

SME Algeria

Plan local realities into the sheet: known contacts, peaks, travel, usual notification channels.

Remote / hybrid

Add a written-confirmation line to tracking: at a distance, a dated, validated production release avoids misunderstandings.

Intercultural

Spell out labels in writing: what seems obvious (who validates, which channel) is not obvious to everyone.

Caution: Generic reminder: personal data, hosting and secrets engage your organisation — classify data, encrypt keys and have them validated by the IT department or the designated contact; this guide is not legal advice.

48h challenge — apply tomorrow

Take 1 real project, run the “before launching” checklist and tick where it stands. Note the contact on the production sheet.

Section exit checklist
  • I ticked a checklist on a real project.
  • I know when to pull out the pre-project and pre-production sheets.
  • I did the 48h challenge or scheduled its date.
Self-rating 1-5: tooling of my projects?dated use of checklists?
Check your understanding

Lina is about to move her scenario into production. What must she tick first?

💡

Tip: print the production-release sheet and keep it near your workstation — in a rush week, you execute, you no longer think.