Microsoft Project Glossary from A to Z

Microsoft Project Glossary — 139 definitions

% complete
Task progress percentage (estimated or based on actual work performed).
Corrective action
Decision taken when facing a variance (adding resources, shifting, reducing scope) to hold objectives.
Assignment
Linking a resource to a task, specifying units (share of the resource devoted to the task).
View
Way of presenting project data: Gantt, Usage, Task Network, Resource Graph, Timeline…
Trade-off
Priority decision between projects when a resource is demanded beyond its capacity.
Auditing/leveling
Resolving overloads by shifting/spreading tasks, automatically or manually.
Lead
Negative lag allowing overlap (e.g. −1 d: the successor starts before the predecessor ends).
Progress bar
Line inside a bar showing the task's completed percentage.
Gantt bar
Graphical representation of a task on the timescale; its shape/color depends on task type.
Best practices
Proven scheduling rules (link rather than date, milestone, baseline, update) ensuring reliability.
Resource calendar
Definition of days/hours worked and absences specific to a resource, distinct from the project calendar.
Task calendar
Specific calendar applied to a task (particular hours) different from the project calendar.
Project calendar
Definition of working days/hours, weekends and holidays used as the basis for computing all durations.
Standard calendar
Base calendar provided (often 8am–5pm, Mon–Fri) customized for your company/project.
Fixed units
Default type: units stay constant; changing work changes duration.
Max capacity
Resource availability (100% = full time, 200% = two units); basis for overload detection.
Knowledge capture
Reusing know-how (templates, lessons learned) from one project to another to save time and quality.
Custom field
Free field (Text, Number, Cost, Date, Flag…) renameable and fillable by a formula.
Baseline fields
Values frozen at baseline time (Baseline Start/Finish/Work/Cost), distinct from current values.
Critical path
Set of zero-float tasks whose delay shifts the project end; often shown in red.
Tool choice
Decision to use desktop Project (expert), Project for the web (intermediate) or Planner (light) as needed.
Timeline
Streamlined time strip presenting phases, milestones and major tasks for a "one page" overview.
Real-time collaboration
Simultaneous editing and tracking by several members, via the cloud (browser, Teams).
Crashing
Shortening duration by adding resources to critical tasks (often at extra cost).
Scheduling conflict
Situation where an imposed constraint contradicts link logic (Project warns).
Consolidation
Grouping several projects into a master for overall management (program/portfolio).
Constraint
Rule imposing a date on a task (Must Start/Finish On…, Don't Start Before…) ; stiffens the schedule.
Copy timeline
Feature exporting the strip to PowerPoint, email or a document, ready to present.
Task cost
Sum of (rate × work) of resources + material costs + cost resources + possible fixed cost.
Fixed cost
Flat expense attached to a task, independent of resources and time (e.g. equipment rental).
Actual cost (AC)
Cost actually spent for work performed to date.
Total project cost
Sum of all task costs, readable on the project's summary task.
CPI / SPI
Performance indices: CPI = EV/AC (costs), SPI = EV/PV (schedule); < 1 = drift.
Project start date
Date from which Project schedules (forward by default); set in Project Information.
Actual dates
Effective start and finish dates of a task, entered during tracking.
Start-to-Start / Finish-to-Finish
SS: both tasks start together; FF: they finish together.
Dependency (link)
Order relationship between two tasks defining which conditions the other's start/finish.
As Soon As Possible
Default flexible constraint: the task starts as early as possible per its links, with no imposed date.
Gantt chart
Visual representation of the schedule: each task is a bar placed on a timescale.
Availability
Share of a resource actually mobilizable (full time, part time), variable across periods.
Variable availability
Different max units across date ranges (e.g. 100% one month, 50% the next).
Flag
Yes/no custom field, useful for marking tasks and filtering them (e.g. "To validate").
Duration
Estimated working time of a task, expressed in days/weeks/hours and computed per the calendar.
Fixed duration
Type where duration stays constant; changing work adjusts units (and vice versa).
Variance
Difference between current/actual value and baseline (delay, cost overrun…).
CV / SV variances
CV = EV − AC (cost variance); SV = EV − PV (schedule variance); negative = unfavorable.
Deadline
Target date shown as a marker, with alert if exceeded, but which doesn't force scheduling.
Timescale
Time axis (days, weeks, months) above the graphic area; adjustable to zoom in or out.
VBA editor
Environment (Alt+F11) where macro code is read, written and run.
Macro recorder
Tool capturing a sequence of actions to replay it; produces VBA code without writing it.
Bar label
Text shown near a bar (name, dates, resources) to enrich Gantt reading.
Calendar exception
Declared deviation from standard working time (leave, specific holiday, particular hours).
PDF export
Generating a PDF file of the schedule/report for sharing with those who don't have Project.
Fast-tracking
Shortening duration by overlapping normally sequential tasks (at increased risk).
Sharer / shared file
The pool is the "shared" file; projects connecting to it are the "sharers".
Filter
Criterion hiding non-matching tasks/resources (critical, late, milestones, by owner…).
Finish-to-Start (FS)
Most common link: the successor task starts when the predecessor is finished.
Field formula
Expression combining other fields and functions to automatically compute a custom field's value.
Task splitting
Interrupting a task then resuming it later, shown as a dotted bar.
Tracking Gantt
View overlaying actual and baseline bars to visualize variances.
Task grid
Left table of the Gantt listing tasks and their fields (name, duration, dates, predecessors).
Indentation (outdent/indent)
Shifting a task in the hierarchy to place it under a summary task (or out of it).
Graphical indicator
Colored icon/dot (traffic light) shown per a field's value (green/amber/red).
Milestone
Zero-duration task marking a key event (approval, delivery, due date); shown as a diamond.
Perpetual license vs subscription
Standard/Professional are bought once (perpetual); Plans are paid monthly/annually.
Cross-project link
Dependency between a task of one project and a task of another project (coordination across sites).
Manual leveling
Resolving overloads through controlled adjustments (spread, replace, shift yourself).
Adapted deliverable
Choosing the communication format per audience (Timeline for management, Gantt for the team).
Macro
Program automating a repetitive task (formatting, filter, export, bulk processing).
Free float
Delay a task can take without shifting the start of its successor task(s).
Total float
Delay a task can take without shifting the project end date.
Update project
Feature pushing unfinished work past a given date (useful after a global stop/delay).
Microsoft 365
Cloud suite integrating Project for the web, Planner, Teams, SharePoint, favoring shared work.
Microsoft Project
Project management software for scheduling tasks, assigning resources and costs, and tracking progress.
Page setup (printing)
Print settings (orientation, scale, columns, headers/footers) for a clean Gantt rendering.
Auto-scheduled mode
Scheduling where Project computes dates from durations, links and constraints; the schedule recalculates itself.
Manually scheduled mode
Scheduling where the user freely sets dates/durations and Project doesn't recalculate automatically.
Template (.mpt)
Reusable model project (tasks, milestones, calendar, generic resources) to quickly start a similar project.
Object model
Project's programmable structure (Projects, Tasks, Resources, Assignments…) manipulable in VBA.
Scheduling options
Settings (File > Options): new task mode (manual/auto), default units, calculation behaviors.
Team Planner
Visual view (Professional) showing resource occupancy and allowing task moves.
Effort-driven scheduling
Behavior (effort-driven) where adding/removing resources redistributes constant total work.
Workload plan
Distribution of resource work over time, revealing who is busy and at what level.
Baseline
Snapshot of the planned project (dates, durations, work, costs) serving as tracking comparison basis.
Planner
Microsoft's simple task management tool (Kanban-like), without advanced scheduling or critical path.
Healthy schedule
Well-built schedule: auto mode, linked tasks, few constraints, clear WBS, up to date and anomaly-free.
Living schedule
Schedule in automatic mode updating as soon as a duration, link or constraint changes.
Checkpoint
Validation step materialized by a milestone, used to track major stage achievement.
Resource pool
Central file grouping resources, to which several projects connect to share them.
Program / Portfolio
Set of linked projects (program) or all of an organization's projects (portfolio).
Project Plan 1/3/5
Cloud subscriptions: Plan 1 (web only), Plan 3 (desktop Professional + web), Plan 5 (+ portfolio/enterprise).
Project for the web
Online version of Project (Microsoft 365), lighter and more collaborative than the desktop app.
Project Professional
Full desktop edition: resource pool, Team Planner, connection to Project Online/Server.
Project Standard
Desktop edition for solo scheduling; no enterprise resource pool or server connection.
Master project
File consolidating several inserted subprojects, offering an overview while leaving them autonomous.
Report (Project)
Dynamic page (Report tab) mixing charts, tables and indicators, generated from project data.
Custom report
User-created/adapted report (fields, charts, formatting) per management needs.
Visual report (Excel/Visio)
Data export to Excel (pivot tables) or Visio (diagrams) for external analysis.
Multiple baselines
Ability to save several baselines (up to 11) to track successive revisions.
Grouping
Gathering rows by category (by resource, priority, status) with subtotals.
Rescheduling
Readjusting the schedule along the way to account for actuals and surprises.
Reporting
Structured communication of project status (progress, risks, costs) to stakeholders.
Cost resource
One-off expense assigned to a task (travel, subcontracting); an amount independent of duration.
Work resource
Human resource (person, team) whose consumption is measured in time; has an hourly/daily rate.
Material resource
Consumable measured in quantity (concrete, paper…); has a unit cost, with no working-time notion.
Shared resources
Pool resources used by several projects, whose load is seen consolidated.
Lag
Positive offset added to a link (e.g. +2 d drying before continuing).
Ribbon
Top strip organizing commands in tabs (Task, Resource, Report, Project, View).
Subproject
Project inserted into a master; appears there as an expandable summary task, but remains a separate file.
Bar styles
Tool customizing bar appearance (colors, shapes) per task type.
Cross-project overallocation
Resource overuse resulting from cumulated assignments across several projects.
Overallocation
Situation where a resource is assigned beyond its max capacity over a period (overload).
Table
Set of columns shown in the grid (Entry, Cost, Tracking tables…), changeable as needed.
Cost table
Column set showing costs per task (planned, actual, remaining, variance costs).
Rate table
Set of a resource's rates (up to 5), allowing different rates per context.
Tracking table
Column set dedicated to progress entry (% complete, actual/remaining work, actual dates).
Dashboard
Concise report combining key indicators (progress, costs, milestones) for an overview.
Dashboard (in Project)
Combination of custom fields, formulas and indicators offering a concise project reading.
Resource sheet
View listing all project resources with their rates, capacities and calendars.
Task
Project's work unit, with a duration, an order (links) and possibly resources and a cost.
Summary task
"Parent" task grouping subtasks; its duration and dates derive automatically from them.
Working time
Time slots considered as worked; set via "Change Working Time" (exceptions, leaves).
Work
Total effort needed, in hours/man-days (distinct from calendar duration).
Fixed work
Type where total effort stays constant; adding resources shortens duration.
Unfinished work
Remaining part of an uncompleted task, rescheduled past the status date.
Actual work
Hours/days effectively spent on a task (distinct from planned work).
Sort
Ordering rows per one or more fields (by date, by cost, by duration).
Work/Duration/Units triangle
Work = Duration × Units relationship governing recalculation during assignments.
Task type
Setting defining which variable (units, duration or work) stays fixed during recalculation.
Assignment units
Assigned resource percentage (100% = full time, 50% = half time, 200% = two units).
Max units
Resource's max capacity over a period; exceeded = overallocation.
Resource usage
View detailing each resource's work period by period; reveals overloads.
Earned value (EV)
Budgeted cost of work actually performed to date (progress × budget).
Current value
Current value of a field, evolving with actuals (to compare with baseline).
Planned value (PV)
Budgeted cost of work scheduled at a given date (from baseline).
VBA
Visual Basic for Applications: macro language common to Office apps, automating Project.
Schedule check
Anomaly check: unlinked tasks, stray constraints, overloads, inconsistent dates.
Analysis view
Table + filter + sort + grouping combination offering a targeted project reading.
WBS
Hierarchical breakdown of the project into phases and subtasks (Work Breakdown Structure).