6.4Toolbox
The essentials in 30 seconds
- Install clean: back up, install the OS, drivers and updates, standard account, licensed software, antivirus, encryption, verified restore.
- Audit: tested backups, updates, MFA, unique passwords, least privilege, shares by need, up-to-date documentation.
- Rule: a checklist ticked every time beats a method known by heart — on the day, you execute.
Sofiane’s thread — the sheets near the workstation
After a quarter, the sheets below stay near Sofiane’s workstation: the installation one displayed next to the screen, the audit one in his notebook. “What saves me,” he says in substance, “isn’t knowing the points, it’s ticking them every time — especially the day before an intervention at the client’s.”
Adapt the wording to your context, keep the structure: it’s what prevents oversights and incidents.
Ready-to-use references
A good checklist makes a task fast, repeatable and complete. Adapt it to your context, but keep the structure: it’s what protects.
Three key moments
An intervention plays out at three moments: install a clean workstation, audit the existing security, and handle an incident without improvising. Three sheets, three must-dos.
Tick, don’t recite
You no longer think under pressure: you execute the sheet near the workstation. What is ticked is done; what is assumed done isn’t.
Set up a workstation
- Back up existing data
- Install the OS (up-to-date media)
- Drivers + full Windows Update
- STANDARD user account (not admin)
- Software with valid licenses; antivirus + firewall active
- Disk encryption (laptops); restore the data and verify
Express security audit
- Backups recent AND tested?
- Updates current (OS + software)?
- MFA active on all accounts?
- Unique passwords (manager)?
- Accounts on least privilege, admins separate?
- Antivirus/firewall active; shares by need; documentation up to date?
Handle an incident end to end
- Qualify: exact symptom, workstation/user, since when
- Isolate if necessary (ransomware, compromised workstation) without shutting down
- Diagnose from simple to complex, one change at a time
- Fix and prove (retest, confirm with the user)
- Restore if needed from a clean, disconnected backup
- Log in the ticket + document the solution (knowledge base)
Script ready to say — set up a clean workstation (30 s)
“Data backed up? Up-to-date OS? Drivers and updates? Standard account? Licensed software? Antivirus/firewall? Encryption? Data restored and verified? If any no, I fix it before returning the workstation.”
Keep this near the next workstation to prepare.
Script ready to say — handle an incident (30 s)
“I qualify, I isolate if needed without shutting down, I diagnose from simple to complex, one change at a time, I prove, I restore if necessary and I document.”
The last safety net before closing a ticket.
Copy-paste template — my checklists
[ ] Data backed up
[ ] OS + drivers + updates
[ ] STANDARD account (not admin)
[ ] Licensed software + antivirus/firewall
[ ] Encryption (laptops)
[ ] Data restored + verified
[ ] Security audit (MFA, privileges, shares)
[ ] Incident logged + documented
Copy-paste template — Windows workstation commands
systeminfo -- system version and state
winget upgrade --all -- update the software
manage-bde -status -- BitLocker encryption
getmac -- MAC address (DHCP reservation)
Very small business / small budget
Sheets on one page displayed on the wall: the essentials (clean workstation, tested backup, MFA, docs) are enough.
Algiers SME
Build the local realities into the sheets: network outages, a single Internet link, heterogeneous hardware, a known point of contact.
Remote / hybrid
Add a written-validation line to the follow-up: at a distance, a dated, ticked intervention avoids misunderstandings.
Intercultural
Make labels explicit in writing: what seems obvious (who validates, which format) isn’t for everyone.
48h challenge — apply it tomorrow
Take 1 real workstation, run the “Set up a workstation” checklist, then the “Express security audit,” and tick where it stands.
- I ticked a checklist on a real workstation.
- I can draw the installation sheet and the express audit.
- I did the 48h challenge or scheduled its date.
Sofiane is setting up a workstation for a user. What must he tick as a priority?
Tip: keep these checklists near the guide’s capstone project (the fleet of Sofiane’s SME).