Project Management Glossary from A to Z
Project Management Glossary — 144 definitions
- All the terms defined in the guide's 30 sections, in alphabetical order.
- Tip: Ctrl + F to search for a term on the page.
- Ongoing activity (operations)
- Repetitive, continuous work with no defined end (production, support). The opposite of a project.
- Audience adaptation
- Adjusting the level of detail and angle to the audience (synthetic steering committee, operational team).
- Tool/need fit
- Principle: the tool is chosen according to the approach, size and team — not by habit or fashion.
- Agility
- Adaptive approach to project management: move forward in short cycles, adjusting to feedback.
- Impact analysis
- Assessing the consequences of a change on cost, schedule, quality, risks and resources.
- Agile approach
- Iterative and incremental, adaptive development in short cycles. Suited to uncertain or evolving needs.
- Predictive approach
- Detailed upfront planning followed by sequential execution (waterfall, V-cycle). Suited to stable needs.
- Trade-off
- Balancing decision between constraints: what to prioritize (schedule? cost? quality?) according to project priorities.
- Physical progress
- The part of a task actually completed, based on concrete deliverables, not on time spent.
- Backlog / increment
- Product backlog: prioritized list of work. Increment: the finished, usable share of product per sprint.
- Product backlog
- Prioritized, evolving list of all the product's valuable work. The PO is responsible for it.
- Need / need statement
- The problem or opportunity behind the project, to be clarified before any solution.
- Project review
- Final summary: objectives met?, cost/schedule variances, satisfaction, key lessons.
- Budget
- Estimated costing of all project costs, often built from the WBS.
- Specification document
- Document detailing the requirements and expected scope of the project.
- Knowledge capitalization
- Keeping and passing on lessons (best practices, pitfalls) to improve future projects.
- CAPM
- Certified Associate in Project Management (PMI): entry-level certification, suited to beginners or juniors.
- Waterfall / V-cycle
- Predictive models: chained phases (the V adds symmetry between specifications and tests/validations).
- Effort
- Amount of work required, in person-days (or hours). Distinct from duration.
- Project charter (mandate)
- Document formalizing the launch: objectives, scope, budget, schedule, and mandate given to the project manager.
- Project manager
- Responsible for meeting the project's objectives: plans, coordinates, steers and communicates.
- Critical path
- The longest sequence of dependent tasks: it sets the project's minimum duration. Any delay on it delays the project.
- Closure
- Final phase: deliver, get validated (acceptance), archive and capitalize lessons (REX).
- Change control board (CCB)
- Body ruling on change requests (often the steering committee on ordinary projects).
- Steering committee
- Decision-making body bringing together sponsor and managers: validates milestones, arbitrates, commits resources.
- Project committee
- Operational body for close tracking: progress, blockers, team coordination.
- Meeting minutes
- Summary of a meeting: decisions, actions (who/what/when), open points. To be circulated quickly.
- Conflict
- Opposition between people or groups (interests, methods, personalities). Inevitable, it is managed rather than avoided.
- Context
- The situation justifying the project: what is happening, why act now.
- Constraint
- Limit imposed on the project (budget, schedule, regulation, resources) to be known from the start.
- Direct / indirect cost
- Direct: attributable to the project (labor, purchases). Indirect: allocated overhead (premises, structure).
- Actual vs planned cost
- Comparison between what was spent and what was budgeted: reveals cost drifts.
- CPI / CV
- Cost Performance Index / Variance: measure cost performance. CPI < 1 = more expensive than planned.
- Success criterion
- Indicator to tell whether the objective is met (e.g. "loading time < 2 s").
- Criticality
- Assessing a risk by combining its probability and impact (often probability × impact). Used to prioritize.
- Project lifecycle
- The chain of project phases, from launch to closure.
- Daily / Review / Retrospective
- Daily: daily sync point. Review: increment demo. Retro: team improvement.
- Early / late dates
- Extreme start/finish dates of a task without delaying the project. Their gap gives the float.
- Decomposition
- Progressively breaking the project down into smaller, manageable pieces.
- Change request
- Any request altering the agreed scope, schedule or budget. To be handled formally.
- Dependency (link)
- Ordering relationship between tasks. Most common: finish-to-start (B starts when A finishes).
- De-escalation
- Set of gestures (calm, listening, reframing) that bring emotional tension down.
- Gantt chart
- Visual schedule representation: each task is a bar on a calendar axis. Readable at a glance.
- Availability
- Actually available time of a resource (leave, other projects, part-time): to be factored into the plan.
- Duration
- Calendar time to perform a task. Depends on effort AND assigned resources and their availability.
- Stake (issue)
- What is at stake: the expected benefit or the risk to avoid. Gives meaning and justifies investment.
- Cross-functional project team
- Team bringing together people from different departments, with no direct hierarchical link to the project manager.
- Three-point estimation
- Combining an optimistic, most-likely and pessimistic value (often via PERT) to factor in uncertainty.
- Analogous estimation
- Estimating based on similar already-completed projects/tasks (fast, but depends on comparability).
- Agile mindset
- Culture of collaboration, adaptation, feedback and continuous improvement — beyond tools.
- Exclusion
- What is explicitly OUT of scope. Writing it down avoids implicit expectations and misunderstandings.
- Flow
- Movement of tasks through stages. Kanban's goal is to make it smooth and fast.
- Win-win
- Solution satisfying both parties' key interests, rather than a power struggle.
- Bottleneck
- Stage where work piles up and slows everything down. The WIP limit helps reveal it.
- Governance
- Organization of project decision and tracking bodies: who decides, who arbitrates, at what pace.
- Multi-project governance
- Bodies and rules steering all projects coherently.
- Hybrid
- Combination of both approaches (e.g. predictive scoping + agile delivery), according to project needs.
- Assumption
- Element assumed true for planning (e.g. "the client will provide content on time"), to be validated and monitored.
- Uncertainty
- Margin of error inherent to any estimate. The newer/complexer the project, the larger it is.
- Initiation
- First phase: define the why, rough scope, stakeholders; decide whether to launch or not.
- Interest
- Degree to which a stakeholder feels concerned by the project and its outcomes.
- Iterative / incremental
- Moving forward in small cycles (iterations) delivering pieces of value (increments), with regular adjustments.
- Iterative and incremental
- Iterative: repeating short cycles; incremental: delivering in cumulative pieces of value.
- Milestone
- Key checkpoint with no duration, marking a deadline or important decision (validation, go/no-go).
- Tracking milestone
- Regular point (weekly, e.g.) where progress and forecasts are updated.
- Milestone on the Gantt
- Key point (diamond) with no duration marking a deadline or decision in the schedule.
- Jira
- Powerful agile tool: backlog, sprints, Scrum/Kanban boards, tracking. Widespread in software development.
- Kanban
- Agile flow-management method: visualize work, limit work in progress, optimize fluidity.
- Leadership
- Ability to influence, unite and motivate without relying on formal authority: making people want to follow.
- WIP limit
- Work In Progress limit: maximum number of tasks allowed simultaneously in a column.
- Smoothing / leveling
- Respreading tasks (via floats, reassignment, shifting) to bring resources back to a realistic load.
- Deliverable
- Tangible, verifiable outcome produced by the project (a report, software, a building).
- Work package
- The smallest WBS element: a task fine enough to be estimated, assigned to someone and tracked.
- Portfolio management
- Selecting, prioritizing and balancing projects by value, strategy and available resources.
- Agile Manifesto
- Founding text (2001) stating 4 values and 12 principles of agility.
- Float
- Delay a task can take without shifting the project (total float) or the next task (free float).
- Power/interest matrix
- Grid ranking stakeholders by power (influence) and interest (concern), to tailor engagement.
- Motivation
- What drives commitment: meaning, recognition, autonomy, growth, belonging — beyond salary.
- MS Project
- Reference software for predictive planning: Gantt, dependencies, critical path, resources, budget.
- Negotiation
- Seeking agreement between parties with partly diverging interests, ideally win-win.
- Scoping note
- Initial synthetic document: context, stakes, objectives, rough scope, constraints. Aligns stakeholders.
- Notion
- All-in-one workspace (docs, databases, boards), very flexible and collaborative.
- SMART objective
- Specific, Measurable, Achievable, Realistic, Time-bound objective. Makes ambition precise and steerable.
- Stakeholder
- Any person or entity concerned by the project (client, team, management, users).
- Scope
- Everything the project must deliver. Expanding it without adjusting cost/schedule unbalances the project.
- Phase
- Project stage grouping a set of activities and leading to deliverables (initiation, planning…).
- Workload plan
- View of workload assigned to each resource over time; reveals overloads and underloads.
- Communication plan
- Who to inform, about what, how often and through which channel, throughout the project.
- Contingency plan
- Action plan prepared in advance, to trigger IF the risk materializes ("plan B").
- Schedule
- Ordering tasks over time, with start and end dates.
- Planning poker
- Collective estimation technique where everyone proposes a value (Fibonacci cards), then discusses and converges.
- PMI-ACP
- Agile Certified Practitioner (PMI): certification focused on agile practices.
- PMO (project office)
- Entity standardizing methods, tooling and supporting project managers, consolidating tracking organization-wide.
- PMP
- Project Management Professional (PMI): the most globally recognized certification, for experienced project managers.
- Points (story points)
- RELATIVE measure of a story's effort/complexity, preferred over absolute durations in agile.
- Project portfolio
- All of an organization's projects, managed collectively to serve strategy.
- Position vs interest
- Position is what one claims; interest, the real need behind it. Negotiating on interests opens solutions.
- Power (influence)
- A stakeholder's ability to weigh on project decisions or course.
- Prerequisite
- Eligibility conditions (experience, training) required before taking a certification.
- PRINCE2
- Structured project management method (process-based), widespread in Europe and the UK.
- Prioritization
- Ordering the backlog by value (and effort), to always work on what matters most first.
- Strategic prioritization
- Choosing which projects to launch/continue/stop by alignment and expected return.
- Change management process
- Defined circuit: formalize request → assess impact → decide (accept/reject) → trace.
- Product Owner / Scrum Master
- PO: owns value, prioritizes backlog. SM: facilitates, protects the team, removes obstacles.
- Project
- Temporary endeavor (start/end) undertaken to create a unique product, service or result.
- Realistic / Time-bound
- Realistic: achievable with available means. Time-bound: bounded by a deadline.
- Acceptance
- Formal client validation that the deliverable meets agreed expectations.
- Recognition
- Valuing contributions and successes: a powerful, often underused engagement driver.
- Risk register
- Document listing identified risks, their criticality, response strategy and owner.
- 100% rule
- The WBS must cover 100% of scope work — no more (nothing out of scope), no less (nothing forgotten).
- Rescheduling
- Updating the schedule from actual progress and remaining work.
- Reporting
- Regular communication of project progress and health, synthetic and decision-oriented.
- PERT network
- Graph of tasks and dependencies, used to compute early/late dates, floats and critical path.
- Contingency reserve
- Amount planned to cover identified uncertainties: a prudent budget always includes one.
- Empowerment
- Entrusting responsibilities and trusting, to engage rather than control.
- Resource
- Means needed for completion: people (with skills) and materials/equipment.
- Remaining spend
- Estimate of what remains to be committed to finish: combined with spent, gives forecast final cost.
- Remaining work
- Objective estimate of work left to do. More reliable than "felt" percentage.
- Lessons learned
- Structured review of what went well/badly, to draw reusable lessons.
- Project meeting
- Framed exchange time (kickoff, tracking, steering committee, retrospective) with objective and decision log.
- Risk
- Uncertain event which, if it occurs, would impact the project (most often negatively).
- Scope creep
- Progressive, uncontrolled scope expansion that overflows schedule and costs.
- Scrum
- Agile framework organizing work in sprints, with 3 roles, 5 events and 3 artifacts.
- Sequencing
- Logically ordering tasks by dependencies and constraints.
- Specific / Measurable
- Specific: precise and unambiguous. Measurable: quantifiable, so achievement can be verified.
- SPI / SV
- Schedule Performance Index / Variance: measure ahead/behind. SPI < 1 = behind.
- Sponsor
- The project's decision-side owner: signs the charter, arbitrates and supports the project manager.
- Sponsor (client)
- The stakeholder owning the project, funding and arbitrating it. Key support of the project manager.
- Sprint
- Fixed-duration iteration (1–4 weeks) delivering a usable increment.
- Engagement strategy
- How to interact with each stakeholder (manage closely, satisfy, inform, monitor) by position.
- Response strategies
- Avoid, Reduce (mitigate), Transfer, or Accept a risk, by criticality and cost.
- Progress tracking
- Regular measurement of actual project state (work done, remaining) vs plan.
- Overload (overallocation)
- Situation where a resource is assigned more work than it can perform in a period.
- Project dashboard
- Synthetic view of key indicators (progress, schedule, cost, risks, quality) to steer at a glance.
- Kanban board
- Column board (states) where tasks (cards) move left to right. Makes flow visible.
- Critical task
- Zero-float task on the critical path: to be watched first.
- Traceability
- Recording requests, decisions and justifications, for history and reference.
- Trello
- Simple, visual Kanban board tool (cards/columns). Ideal for small projects or light flows.
- Golden triangle
- Model linking cost, schedule and quality/scope: these three constraints balance out, they cannot all be optimized at once.
- User story
- User-side need statement: "As a…, I want…, so that…". Value-centered.
- Value (agile)
- Real benefit for the client. Deliver value early and often, rather than everything at the end.
- Earned value (EVM)
- Method crossing planned value, earned value and actual cost to objectively measure schedule and cost.
- Planned / earned value / actual cost
- EVM's 3 quantities: what was planned, what is actually done (valued), what was spent.
- WBS
- Work Breakdown Structure: hierarchical breakdown of the project into deliverables then tasks, down to work packages.