Project Management Glossary from A to Z

Project Management Glossary — 144 definitions

Ongoing activity (operations)
Repetitive, continuous work with no defined end (production, support). The opposite of a project.
Audience adaptation
Adjusting the level of detail and angle to the audience (synthetic steering committee, operational team).
Tool/need fit
Principle: the tool is chosen according to the approach, size and team — not by habit or fashion.
Agility
Adaptive approach to project management: move forward in short cycles, adjusting to feedback.
Impact analysis
Assessing the consequences of a change on cost, schedule, quality, risks and resources.
Agile approach
Iterative and incremental, adaptive development in short cycles. Suited to uncertain or evolving needs.
Predictive approach
Detailed upfront planning followed by sequential execution (waterfall, V-cycle). Suited to stable needs.
Trade-off
Balancing decision between constraints: what to prioritize (schedule? cost? quality?) according to project priorities.
Physical progress
The part of a task actually completed, based on concrete deliverables, not on time spent.
Backlog / increment
Product backlog: prioritized list of work. Increment: the finished, usable share of product per sprint.
Product backlog
Prioritized, evolving list of all the product's valuable work. The PO is responsible for it.
Need / need statement
The problem or opportunity behind the project, to be clarified before any solution.
Project review
Final summary: objectives met?, cost/schedule variances, satisfaction, key lessons.
Budget
Estimated costing of all project costs, often built from the WBS.
Specification document
Document detailing the requirements and expected scope of the project.
Knowledge capitalization
Keeping and passing on lessons (best practices, pitfalls) to improve future projects.
CAPM
Certified Associate in Project Management (PMI): entry-level certification, suited to beginners or juniors.
Waterfall / V-cycle
Predictive models: chained phases (the V adds symmetry between specifications and tests/validations).
Effort
Amount of work required, in person-days (or hours). Distinct from duration.
Project charter (mandate)
Document formalizing the launch: objectives, scope, budget, schedule, and mandate given to the project manager.
Project manager
Responsible for meeting the project's objectives: plans, coordinates, steers and communicates.
Critical path
The longest sequence of dependent tasks: it sets the project's minimum duration. Any delay on it delays the project.
Closure
Final phase: deliver, get validated (acceptance), archive and capitalize lessons (REX).
Change control board (CCB)
Body ruling on change requests (often the steering committee on ordinary projects).
Steering committee
Decision-making body bringing together sponsor and managers: validates milestones, arbitrates, commits resources.
Project committee
Operational body for close tracking: progress, blockers, team coordination.
Meeting minutes
Summary of a meeting: decisions, actions (who/what/when), open points. To be circulated quickly.
Conflict
Opposition between people or groups (interests, methods, personalities). Inevitable, it is managed rather than avoided.
Context
The situation justifying the project: what is happening, why act now.
Constraint
Limit imposed on the project (budget, schedule, regulation, resources) to be known from the start.
Direct / indirect cost
Direct: attributable to the project (labor, purchases). Indirect: allocated overhead (premises, structure).
Actual vs planned cost
Comparison between what was spent and what was budgeted: reveals cost drifts.
CPI / CV
Cost Performance Index / Variance: measure cost performance. CPI < 1 = more expensive than planned.
Success criterion
Indicator to tell whether the objective is met (e.g. "loading time < 2 s").
Criticality
Assessing a risk by combining its probability and impact (often probability × impact). Used to prioritize.
Project lifecycle
The chain of project phases, from launch to closure.
Daily / Review / Retrospective
Daily: daily sync point. Review: increment demo. Retro: team improvement.
Early / late dates
Extreme start/finish dates of a task without delaying the project. Their gap gives the float.
Decomposition
Progressively breaking the project down into smaller, manageable pieces.
Change request
Any request altering the agreed scope, schedule or budget. To be handled formally.
Dependency (link)
Ordering relationship between tasks. Most common: finish-to-start (B starts when A finishes).
De-escalation
Set of gestures (calm, listening, reframing) that bring emotional tension down.
Gantt chart
Visual schedule representation: each task is a bar on a calendar axis. Readable at a glance.
Availability
Actually available time of a resource (leave, other projects, part-time): to be factored into the plan.
Duration
Calendar time to perform a task. Depends on effort AND assigned resources and their availability.
Stake (issue)
What is at stake: the expected benefit or the risk to avoid. Gives meaning and justifies investment.
Cross-functional project team
Team bringing together people from different departments, with no direct hierarchical link to the project manager.
Three-point estimation
Combining an optimistic, most-likely and pessimistic value (often via PERT) to factor in uncertainty.
Analogous estimation
Estimating based on similar already-completed projects/tasks (fast, but depends on comparability).
Agile mindset
Culture of collaboration, adaptation, feedback and continuous improvement — beyond tools.
Exclusion
What is explicitly OUT of scope. Writing it down avoids implicit expectations and misunderstandings.
Flow
Movement of tasks through stages. Kanban's goal is to make it smooth and fast.
Win-win
Solution satisfying both parties' key interests, rather than a power struggle.
Bottleneck
Stage where work piles up and slows everything down. The WIP limit helps reveal it.
Governance
Organization of project decision and tracking bodies: who decides, who arbitrates, at what pace.
Multi-project governance
Bodies and rules steering all projects coherently.
Hybrid
Combination of both approaches (e.g. predictive scoping + agile delivery), according to project needs.
Assumption
Element assumed true for planning (e.g. "the client will provide content on time"), to be validated and monitored.
Uncertainty
Margin of error inherent to any estimate. The newer/complexer the project, the larger it is.
Initiation
First phase: define the why, rough scope, stakeholders; decide whether to launch or not.
Interest
Degree to which a stakeholder feels concerned by the project and its outcomes.
Iterative / incremental
Moving forward in small cycles (iterations) delivering pieces of value (increments), with regular adjustments.
Iterative and incremental
Iterative: repeating short cycles; incremental: delivering in cumulative pieces of value.
Milestone
Key checkpoint with no duration, marking a deadline or important decision (validation, go/no-go).
Tracking milestone
Regular point (weekly, e.g.) where progress and forecasts are updated.
Milestone on the Gantt
Key point (diamond) with no duration marking a deadline or decision in the schedule.
Jira
Powerful agile tool: backlog, sprints, Scrum/Kanban boards, tracking. Widespread in software development.
Kanban
Agile flow-management method: visualize work, limit work in progress, optimize fluidity.
Leadership
Ability to influence, unite and motivate without relying on formal authority: making people want to follow.
WIP limit
Work In Progress limit: maximum number of tasks allowed simultaneously in a column.
Smoothing / leveling
Respreading tasks (via floats, reassignment, shifting) to bring resources back to a realistic load.
Deliverable
Tangible, verifiable outcome produced by the project (a report, software, a building).
Work package
The smallest WBS element: a task fine enough to be estimated, assigned to someone and tracked.
Portfolio management
Selecting, prioritizing and balancing projects by value, strategy and available resources.
Agile Manifesto
Founding text (2001) stating 4 values and 12 principles of agility.
Float
Delay a task can take without shifting the project (total float) or the next task (free float).
Power/interest matrix
Grid ranking stakeholders by power (influence) and interest (concern), to tailor engagement.
Motivation
What drives commitment: meaning, recognition, autonomy, growth, belonging — beyond salary.
MS Project
Reference software for predictive planning: Gantt, dependencies, critical path, resources, budget.
Negotiation
Seeking agreement between parties with partly diverging interests, ideally win-win.
Scoping note
Initial synthetic document: context, stakes, objectives, rough scope, constraints. Aligns stakeholders.
Notion
All-in-one workspace (docs, databases, boards), very flexible and collaborative.
SMART objective
Specific, Measurable, Achievable, Realistic, Time-bound objective. Makes ambition precise and steerable.
Stakeholder
Any person or entity concerned by the project (client, team, management, users).
Scope
Everything the project must deliver. Expanding it without adjusting cost/schedule unbalances the project.
Phase
Project stage grouping a set of activities and leading to deliverables (initiation, planning…).
Workload plan
View of workload assigned to each resource over time; reveals overloads and underloads.
Communication plan
Who to inform, about what, how often and through which channel, throughout the project.
Contingency plan
Action plan prepared in advance, to trigger IF the risk materializes ("plan B").
Schedule
Ordering tasks over time, with start and end dates.
Planning poker
Collective estimation technique where everyone proposes a value (Fibonacci cards), then discusses and converges.
PMI-ACP
Agile Certified Practitioner (PMI): certification focused on agile practices.
PMO (project office)
Entity standardizing methods, tooling and supporting project managers, consolidating tracking organization-wide.
PMP
Project Management Professional (PMI): the most globally recognized certification, for experienced project managers.
Points (story points)
RELATIVE measure of a story's effort/complexity, preferred over absolute durations in agile.
Project portfolio
All of an organization's projects, managed collectively to serve strategy.
Position vs interest
Position is what one claims; interest, the real need behind it. Negotiating on interests opens solutions.
Power (influence)
A stakeholder's ability to weigh on project decisions or course.
Prerequisite
Eligibility conditions (experience, training) required before taking a certification.
PRINCE2
Structured project management method (process-based), widespread in Europe and the UK.
Prioritization
Ordering the backlog by value (and effort), to always work on what matters most first.
Strategic prioritization
Choosing which projects to launch/continue/stop by alignment and expected return.
Change management process
Defined circuit: formalize request → assess impact → decide (accept/reject) → trace.
Product Owner / Scrum Master
PO: owns value, prioritizes backlog. SM: facilitates, protects the team, removes obstacles.
Project
Temporary endeavor (start/end) undertaken to create a unique product, service or result.
Realistic / Time-bound
Realistic: achievable with available means. Time-bound: bounded by a deadline.
Acceptance
Formal client validation that the deliverable meets agreed expectations.
Recognition
Valuing contributions and successes: a powerful, often underused engagement driver.
Risk register
Document listing identified risks, their criticality, response strategy and owner.
100% rule
The WBS must cover 100% of scope work — no more (nothing out of scope), no less (nothing forgotten).
Rescheduling
Updating the schedule from actual progress and remaining work.
Reporting
Regular communication of project progress and health, synthetic and decision-oriented.
PERT network
Graph of tasks and dependencies, used to compute early/late dates, floats and critical path.
Contingency reserve
Amount planned to cover identified uncertainties: a prudent budget always includes one.
Empowerment
Entrusting responsibilities and trusting, to engage rather than control.
Resource
Means needed for completion: people (with skills) and materials/equipment.
Remaining spend
Estimate of what remains to be committed to finish: combined with spent, gives forecast final cost.
Remaining work
Objective estimate of work left to do. More reliable than "felt" percentage.
Lessons learned
Structured review of what went well/badly, to draw reusable lessons.
Project meeting
Framed exchange time (kickoff, tracking, steering committee, retrospective) with objective and decision log.
Risk
Uncertain event which, if it occurs, would impact the project (most often negatively).
Scope creep
Progressive, uncontrolled scope expansion that overflows schedule and costs.
Scrum
Agile framework organizing work in sprints, with 3 roles, 5 events and 3 artifacts.
Sequencing
Logically ordering tasks by dependencies and constraints.
Specific / Measurable
Specific: precise and unambiguous. Measurable: quantifiable, so achievement can be verified.
SPI / SV
Schedule Performance Index / Variance: measure ahead/behind. SPI < 1 = behind.
Sponsor
The project's decision-side owner: signs the charter, arbitrates and supports the project manager.
Sponsor (client)
The stakeholder owning the project, funding and arbitrating it. Key support of the project manager.
Sprint
Fixed-duration iteration (1–4 weeks) delivering a usable increment.
Engagement strategy
How to interact with each stakeholder (manage closely, satisfy, inform, monitor) by position.
Response strategies
Avoid, Reduce (mitigate), Transfer, or Accept a risk, by criticality and cost.
Progress tracking
Regular measurement of actual project state (work done, remaining) vs plan.
Overload (overallocation)
Situation where a resource is assigned more work than it can perform in a period.
Project dashboard
Synthetic view of key indicators (progress, schedule, cost, risks, quality) to steer at a glance.
Kanban board
Column board (states) where tasks (cards) move left to right. Makes flow visible.
Critical task
Zero-float task on the critical path: to be watched first.
Traceability
Recording requests, decisions and justifications, for history and reference.
Trello
Simple, visual Kanban board tool (cards/columns). Ideal for small projects or light flows.
Golden triangle
Model linking cost, schedule and quality/scope: these three constraints balance out, they cannot all be optimized at once.
User story
User-side need statement: "As a…, I want…, so that…". Value-centered.
Value (agile)
Real benefit for the client. Deliver value early and often, rather than everything at the end.
Earned value (EVM)
Method crossing planned value, earned value and actual cost to objectively measure schedule and cost.
Planned / earned value / actual cost
EVM's 3 quantities: what was planned, what is actually done (valued), what was spent.
WBS
Work Breakdown Structure: hierarchical breakdown of the project into deliverables then tasks, down to work packages.