6.4 · Toolbox

Level 6 · In Practice

6.4Toolbox

Goal: hold operational checklists and essential project-driving landmarks.
Estimated time: 10 min · If you only have 5 min: read “The essentials in 30s” + the diagram.

The essentials in 30 seconds

  • Secure: a short checklist (need, SMART, scope, stakeholders, charter, governance, approach, risks) avoids most blind starts.
  • Draw: ready landmarks (golden triangle, WBS then Gantt, effort ≠ duration, critical path, remaining work, change, agile, closure) for decision moments.
  • Rule: one checklist ticked every time beats a long ignored method — adapt to your context and approach.

Bilal thread — 1 year on: landmarks at hand

One year on, both checklists below are posted at Bilal's place: the pre-launch one on his wall, the landmarks-to-draw one near his Gantt. “What saved me, he says in substance, is not knowing the landmarks, it is ticking them every time — especially on rush days.”

Adapt wordings to your context (predictive or agile), keep the structure: it is what avoids omissions and overruns.

Ready-to-use landmarks

A good checklist makes a task fast and forget-free; good landmarks speed decisions. Adapt to your context and approach (predictive or agile).

Before launching a project

  • Is the need clarified (scoping note)?
  • Are objectives SMART?
  • Is scope written (included / excluded / assumptions)?
  • Are stakeholders analyzed (power/interest)?
  • Is the charter signed by the sponsor?
  • Is governance defined (steering / project committee)?
  • Is the approach (predictive / agile / hybrid) chosen by need?
  • Is a risk register started?

Landmarks & reflexes at hand

  • Golden triangle: cost / schedule / quality — arbitrate, don't maximize everything
  • WBS first (the WHAT), Gantt next (the WHEN)
  • Effort ≠ duration (calendar time); target ~80% load
  • Critical path = zero-float tasks → priority vigilance
  • Steer by REMAINING WORK; SPI<1 = behind, CPI<1 = overrun
  • Change: formalize → impact → decide → trace
  • Agile: prioritized backlog, increment per sprint, limit WIP
  • Closure: acceptance + delivery + archiving + review (blameless)
Common misinterpretation: “collecting checklists”. No. A checklist is only useful ticked and dated: take the one for your next start, the others will wait.

Ready-to-say script — pick your landmark in 30 seconds (30 s)

“Starting: I check need, SMART, written scope, signed charter. Planning: WBS then Gantt, critical path identified. Steering: remaining work and risks. I picked, I tick, I decide.”

Copy-paste template — pre-launch tracking (1 line per item)

PROJECT: ...
Need clarified (scoping note) on ...: OK / to redo
SMART OBJECTIVES on ...: OK / to rephrase
SCOPE (included / excluded / assumptions) written on ...: OK / to write
STAKEHOLDERS (power / interest) on ...: OK / to analyze
CHARTER signed by the sponsor on ...: OK / to have signed
GOVERNANCE (steering / project committee) on ...: OK / to define
APPROACH (predictive / agile / hybrid) on ...: ...
RISKS started on ...: OK / to start

Small business / tight budget

Checklists on one page posted on the wall: the essentials (need, scope, risks, review) are enough.

Algeria SME

Plan real lead times and availability into the checklist: what to verify, with whom, with what margin before committing.

Remote / hybrid

Add a written-validation line to tracking: at a distance, scope shared in writing avoids misunderstandings.

Cross-cultural

State governance and roles in writing: what seems obvious is not obvious to everyone.

48h challenge — apply tomorrow

Take 1 ongoing project, run the checklist above and tick where it stands. Fix the missing line before moving on.

Section exit checklist
  • I have ticked the checklist on a real project.
  • I can draw a landmark (critical path, remaining work, WIP, review) at the right moment.
  • I did the 48h challenge or scheduled its date.
Self-rating 1-5: tooling of my projects?use of landmarks?
Check your understanding

Before launching his project, what should Bilal verify first per the checklist?

💡

Tip: keep these landmarks near your templates (scoping note, charter, risk register, dashboard); adapt them to the project's predictive or agile approach.