Purchasing & Supply Chain Glossary A to Z

Purchasing & Supply Chain glossary — 143 definitions

3-way match
Pre-payment control: invoice = purchase order (what was ordered, agreed prices) = receipt (what was actually received); the main protection against errors and fraud.
5S
Sort, set in order, shine, standardize, sustain: the workspace discipline that makes the abnormal visible — the foundation of any high-performing warehouse.
ABC analysis
Ranking items by decreasing annual consumption value: A (~20% of items, ~80% of value), B, C — to differentiate the management effort.
Acceptance criteria
Verifiable conditions under which a delivery is judged compliant on receipt (checks, tolerances, tests); to be written BEFORE the purchase, not after the dispute.
Addressing (location coding)
Coding every location (aisle-bay-level) with a system match: find without searching, put away without memory, count without chaos.
Advance/downstream (upstream/downstream)
Upstream is the supplier side (before the company), downstream the customer side (after it); physical flows move downstream, money flows back upstream.
B2B marketplace
Online platform connecting professional buyers and suppliers (notably for imports); useful for spotting, but qualification remains essential.
Batch traceability
Recording, at each step, the batch involved (which batch received from which supplier, shipped to which customer); the condition for a targeted recall — often mandatory by sector and country.
BATNA (best alternative)
Best Alternative To a Negotiated Agreement (another supplier, postponement, another solution); the real source of negotiating power.
Bullwhip effect
Amplification of demand variations as you move up the chain, caused by decisions made link by link without sharing information.
Buffer functions (stock functions)
Service (serve without waiting for replenishment), safety (absorb variability), cycle (economic lots and minimums), anticipation (seasonality), speculation (before a price rise).
Continuous evaluation
Regular measurement of real performance (OTIF, non-conformities, disputes, price) shared with the supplier; feeds retention, improvement plan or exit.
Continuous improvement (Kaizen)
Improvement in small steps, driven by those who do the work: one concrete problem at a time, measured, corrected, standardized — then repeat.
Carrying cost (holding cost)
Annual cost of holding stock: tied-up cash + storage + depreciation (breakage, theft, expiry, obsolescence); typically 15 to 30% of stock value per year.
Circular economy
Purchasing options beyond new-and-disposable: refurbished, second-hand, rental/usage, repairability, recovery of waste and unsold goods.
Click & collect
Order online, pick up in store or at a point: minimal logistics cost and in-store traffic — the cheapest mode for the retailer.
CIF (Cost, Insurance, Freight)
Sea freight: the seller pays transport and insurance to the arrival port, but RISK transfers to the buyer as soon as goods are loaded at departure — the classic trap.
CMR / B/L / AWB
Transport documents: international road consignment note (CMR), sea bill of lading (B/L — represents the goods), air waybill (AWB).
Consultation (tender / RFQ round)
Requesting offers from several suppliers on a common basis (specs), with a deadline and imposed response format, to compare and choose.
Container (TEU)
Twenty-foot Equivalent Unit: the unit of containerized capacity (a 40-foot container = 2 TEU).
Continuity plan (BCP)
A response prepared per major risk: warning signals, first actions, an owner, PRE-QUALIFIED alternatives — in a crisis you execute instead of discovering.
Cross-docking
A storage-free scheme: received goods are reallocated straight from receiving to shipping; demanding on synchronization, very stock-efficient.
Cost of stockout
The cost of a shortage: lost sales, halted production, lost customers, emergency buying at a premium — the highest and most underestimated of the three costs.
Distribution platform
An intermediate warehouse that consolidates goods from several origins to redistribute them to points of sale or customers.
Distributive / integrative negotiation
Distributive: splitting a fixed value (win-lose, on one line). Integrative: widening the scope (volumes, duration, services) to create shared value.
Dormant item
An item with no movement for several months; costs its carrying rate for nothing — to be dealt with (clearance, return, scrap) without sentimentality.
Double sourcing
Two qualified sources (ideally in different regions) for critical items; the redundancy that turns a failure into a simple switch.
Duty of vigilance
An obligation (growing by country, cascading via large buyers) to identify and prevent serious harm to human rights and the environment in one's supply chain.
EAN-13 / GS1
Worldwide standard product barcode (unique item identifier), administered by the GS1 organization that issues company prefixes.
Economic order quantity (Wilson)
The order quantity that minimizes ordering cost + carrying cost; simplistic assumptions but a robust order of magnitude, to align with MOQ, packaging and free-freight thresholds.
ERP
Enterprise Resource Planning: all processes (purchasing, stock, sales, accounting) on a SINGLE database — the end of re-keying and contradictory spreadsheets; SAP is the large-account reference.
Escalation
Graduated handling of a dispute: operational level first, commercial next, contractual/legal last — skipping steps needlessly destroys the relationship.
EXW (Ex Works)
Goods made available at the seller's factory: the buyer handles everything (loading, transport, export and import customs); minimal price, maximal complexity.
FCL / LCL
Containerized sea freight: Full Container Load (a container to yourself) vs Less than Container Load (groupage paid by volume in a shared container).
FEFO
First Expired, First Out: issue first the batches whose expiry date is nearest; the rule for dated products, requiring batch management.
FIFO (physical)
Goods rotation rule: issue the oldest batches first to avoid ageing and obsolescence — independent of the accounting valuation method.
FIFO (valuation)
First In, First Out: issues are valued at the prices of the oldest batches; the remaining stock reflects recent prices.
FOB (Free On Board)
Sea freight: the seller clears export and loads on board at the departure port; costs and risks pass to the buyer once the goods are on board (for containers, prefer FCA).
Framework contract
A contract setting the general terms of a recurring purchasing relationship (price, quality, logistics, responsibilities); successive orders attach to it.
Functional specification (functional spec)
Describes the need in expected results and functions, without imposing the solution; lets suppliers propose and keeps competition alive.
General terms (GTP / GTS)
General Terms of Purchase (the buyer's) and of Sale (the supplier's); contradictory by design — the conflict is settled BEFORE signing.
Incoterms
Standardized rules (ICC, 2020 version) allocating costs, obligations and risk transfer of international transport between seller and buyer; always cite rule + place + version.
Inventory discrepancy
Difference between counted stock and system stock; handled in two steps: fix the figure AND find the process cause (receiving, picking, entry) — otherwise it returns.
Just-in-time (JIT)
Supply/produce what is requested, when and in the quantity requested; a machine for building reliability (low stock reveals problems) — demanding and to be balanced with resilience.
Kanban
A visual pull-flow replenishment signal (the empty bin, the card that triggers the order): simple, robust, self-regulating.
Last mile
The final delivery segment to the customer: the shortest and most expensive (often a third to a half of total cost) because consolidation reverses there.
Lead time
Total delay between placing the order and goods availability (preparation + transport + customs + receipt); a key parameter for sizing stock.
Lifecycle cost
TCO extended to the product's whole life: purchase + energy + maintenance + lifespan + end of life — often reconciles ecology and economy.
LIFO
Last In, First Out: issues at recent prices, stock at old prices; banned by many accounting standards (notably IFRS) — worth knowing, rarely worth using.
Link (chain link)
A stage of the chain (sourcing, production, storage, distribution, customer); the chain moves at the pace of its slowest link.
Logistics
The operational component of the supply chain: warehousing, handling, order preparation and transport of goods.
Logistics cost / revenue
Transport (and preparation) costs as a share of revenue or per unit: the ratio that makes logistics costs comparable over time.
Lot / weighted average cost (WAC)
Weighted Average Unit Cost: each receipt recomputes the average cost (total value ÷ total quantity); issues are at the average cost — smoothing price variations.
Make or buy
The trade-off between doing it yourself and buying (or renting, pooling, refurbishing); the first question to ask before any major purchase.
Messenger / groupage / full truck (parcel/LTL/FTL)
Road segments by shipment size: parcels (express networks), pallets grouped with other customers (LTL), a whole dedicated vehicle (FTL) — each segment jump changes unit prices.
Milk-run / periodic review
Periodic replenishment: order on a fixed date to reach a target level; groups orders per supplier (transport, free freight) at the cost of a slightly higher safety stock.
Mono-sourcing / multi-sourcing
A single source per item (simplicity, concentrated volumes, dependence) vs several sources (security, competition, heavier management).
MOQ
Minimum Order Quantity imposed by the supplier; a high MOQ forces overstocking and is negotiated like price.
Muda (waste)
Anything consuming resources without value for the customer: overproduction, excess stock, useless transport and motion, waiting, over-quality, defects.
Multi-criteria grid
An offer-comparison table on weighted criteria defined BEFORE opening the offers; makes the choice objective, traceable and explainable.
Need expression
Formalizing what must be bought: what (required characteristics), how much, when, at what quality level, within what budget.
Obsolescence
Loss of value of stock become unsellable or unusable (fashion, technology, expiry); the silent depreciation of sleeping stock.
Order point (reorder point)
The stock threshold that triggers the order: (average demand × average lead time) + safety stock — covers consumption during the replenishment lead time.
OTIF
On Time In Full: % of deliveries on time AND complete; measured both ways (your suppliers to you, you to your customers) — the definition must be pinned down precisely.
Overspecification
Requirements above the real need (top-of-range by default, copying a specific brand); the leading source of avoidable extra costs.
P2P (Procure-to-Pay)
The full purchase-to-payment process: purchase request → purchase order → confirmation → controlled receipt → invoice → matching → payment.
Pallet rack
Metal racking for pallets; maximum loads displayed and respected, guards and periodic checks — rack collapse is the warehouse's major accident.
Pareto's law
The 80/20 principle: a minority of causes concentrates the majority of effects; the basis of ABC and a universal prioritization tool.
Performance review
A periodic meeting with a key supplier: measured indicators, mutual listening, a dated improvement plan, outlook — the central steering tool.
Pick by order / batch picking
Order by order (simple, one trip per order) vs by batches/waves: a single route picks several orders, sorted afterwards — a major gain on many small orders.
Pick-to-light / voice picking
Picking aids: lights showing location and quantity, or hands-free voice guidance; for the volumes that justify them, AFTER the organization.
Picking
Retrieving an order's items from stock, followed by grouping, checking and packing; the warehouse's top labor cost.
Pickup point / locker
Pooled delivery at a partner retailer or an automated locker: reduced cost, near-zero delivery failure, time flexibility for the customer.
Picking path
Sequencing pick-ups along a logical route (by aisle, no backtracking); a simple sort by location address achieves it.
Progress plan
Dated, measurable improvement commitments, agreed at review, on BOTH sides (the customer also has progress to make: forecasts, orders, payments).
Proof of delivery (POD)
Signed/time-stamped confirmation of handover to the recipient; closes shipment tracking and stands as evidence in a dispute.
Purchase order (PO)
The contractual document by which the buyer formally orders (references, quantities, prices, deadlines, terms); the piece that binds both parties.
Purchase request (PR)
An internal request approved before commitment: the budget control point (who can commit what, up to what amount).
Purchasing
Strategic function: supplier market analysis, selection, negotiation, contracting and panel steering — decides from whom and on what terms one buys.
Qualification
Verifying that a supplier can deliver compliantly and sustainably: legal existence, financial health, references, capacity, certifications — proportionate to the stake.
Reception reserves (delivery reservations)
Written, immediate, precise notes of anomalies found on receipt (missing, breakage, non-conformity); they condition later recourse.
Referencing (approval)
The decision to approve a supplier to the panel after qualification/selection; opens the right to place orders with them.
Replenishment (periodic)
Ordering on a fixed date to bring stock back to a target level; groups orders per supplier at the cost of a slightly higher safety stock.
Requirements challenge (need challenge)
~80% of cost is locked at the specification of the need — so CHALLENGE the need (overspecification, "just in case" quantities, false urgencies, imposed brands).
Responsible purchasing
Integrating environmental, social and ethical criteria into buying decisions, alongside cost/quality/lead time — prioritized by risk mapping.
Reverse logistics
Returns logistics: the reverse flow (customer → seller) to design as a process (label, drop-off, sorting, refund) — framed by distance-selling law, varying by country.
Reversibility (exit terms)
Contractual end-of-relationship terms: notice, transfer (tooling, stock, documentation), continuity during transition — negotiated at entry, not at exit.
RFID
Radio tags read without contact or aim, in bulk and at a distance; costlier per tag than a barcode, worthwhile when read speed matters (flash inventories).
RFQ / RFI / RFP
RFQ: a priced quotation request. RFI: a request for information on a supplier's capabilities. RFP: a full proposal request (solution + price) for a complex need.
Risk mapping
An inventory of risks (suppliers, logistics, geopolitical, market, internal, climate) rated on probability × impact; prioritizes action on the 3-5 major risks.
Rotation (turnover)
Annual consumption ÷ average stock (in value): the number of times stock renews in a year; judged in trend and internal comparison.
Safety stock
A reserve sized to absorb the variability of demand AND lead time, per the target service level; the price of irregularity (yours and the supplier's).
Savings
Realized purchasing savings, measured by an explicit methodology (baseline, scope, validation) — otherwise a communication figure, not a management one.
Scope of stock (coverage)
Stock ÷ average consumption, in days or weeks of demand ("6 weeks of stock"); the telling inverse of rotation.
Selection criteria
An explicit grid for appraising a supplier: price, quality, lead time, financial health, capacity, certifications, location, CSR — weighted by purchasing family.
Single point of failure
An element with no alternative whose failure stops everything: a sole supplier of a critical item, a single route, a single site, a single person — the priority target for treatment.
Slotting (layout)
Placing items by their pick frequency: fast movers near shipping and in the "golden zone", slow movers up high/at the back — periodically reviewed.
S&OP
Sales & Operations Planning: a monthly ritual aligning sales, supply and management on ONE shared set of figures (demand, capacity, stock) — forecasting as a collective process.
Sourcing
Searching, identifying and qualifying potential suppliers for a purchasing family; aims for several credible candidates, the condition for competition.
Specifications (statement of work)
The reference document describing what is expected of the product or service; the common basis for costing, comparing offers and judging conformity.
SRM
Supplier Relationship Management: structured management of supplier relationships over time — segmentation, performance reviews, progress plans, dispute handling.
SSCC
Serial Shipping Container Code: a worldwide unique number for a shipping unit (pallet, parcel) — the "license plate" the whole chain can read and track.
Stock reliability (IRA)
Inventory Record Accuracy: the % of items whose physical stock matches system stock (within tolerance); aim for 95-98% — below 90%, every calculation runs on sand.
Strategic stock
A deliberate buffer on vital items, sized by calculation: carrying cost vs (probability-weighted) cost of the stoppage avoided — a costed insurance, not a return to overstock.
Supplier audit
A structured visit to a supplier's site (facilities, organization, quality) to check the reality behind the commercial file; reserved for high stakes.
Supplier charter
A contractual document stating the CSR commitments expected of suppliers (working conditions, environment, ethics), with audit rights and consequences.
Supplier lock-in
A situation where the specification (imposed brand, characteristics copied from a specific product) effectively bars all competition; to hunt down in every spec.
Supplier panel
The set of qualified/approved suppliers, by purchasing family, drawn on for consultations; maintained continuously (entries, exits, monitoring).
Supplier risk
The probability that a supplier fails (finances, capacity, dependencies, location); the fourth purchasing dimension, assessed alongside CQD.
Supplier scoring
A weighted score summarizing a supplier's evaluation criterion by criterion; makes selection and monitoring objective and comparable.
Supplier segmentation
Ranking the portfolio (strategic / important / transactional) to concentrate relationship time where the stakes are.
Supply
The operational function: place orders at the right time, track deliveries, chase, keep stock at the right level within the terms negotiated by purchasing.
Supply chain
The end-to-end view of flows, from the supplier's supplier to the customer's customer (production, storage, transport, distribution).
The three flows
Physical flow (goods), information flow (orders, forecasts, tracking) and financial flow (invoices, payments) — the supply chain synchronizes them.
Total cost of ownership (TCO)
The full cost of a purchase: price + transport + customs + stock + non-quality + admin costs + risk — the real basis for comparing offers.
Preparation error rate
Errors / lines picked; reduced by clear labeling, scanning at location and item, and a proportionate final check — each error costs disproportionately.
Push / pull flow
Push flow: produce/stock from forecasts, ahead of demand. Pull flow: produce/order in response to real demand.
Prescriber / requester
The one who expresses the need (user, technician, department); the buyer challenges them constructively without replacing their functional expertise.
Price revision clause
A contractual term framing price change over time (indexation, cap, review meeting); negotiated BEFORE signing, never after.
Purchasing leverage
A piece of value to exchange: volume, commitment duration, documented competition, regularity, fast payment, flexibility on lead times or specs.
Demand forecast
A projection of future demand from cleaned history (trend, seasonality, randomness); always wrong by nature — its measured error margin sizes safety stock.
Return rate
The share of sales returned; steered downstream (an efficient returns process) and above all upstream (precise product sheets, sizes, photos, reviews) — the best return is the one avoided.
Service level (supplier)
The percentage of demand served on time and in full; measures the reliability of a supplier or chain toward its customers.
Service level (stock)
The probability of not being out of stock over a cycle; aiming for 95% costs far less than 99% — the last points are the most expensive.
Break point (walk-away point)
The threshold (price, terms) beyond which one gives up the deal; set cold, before negotiating, so as not to cross it under pressure.
Shrinkage (unknown loss)
The unexplained part of discrepancies (theft, undeclared breakage, untraced errors); reduced by organization: dedicated locations, all movements recorded, restricted access.
Tender (call for tenders)
A structured form of consultation for complex or high-stakes purchases: a full file, a framed process, sometimes a shortlist then a detailed offer.
Three flows synchronization
See "The three flows": physical, information and financial flows kept in step across the chain.
TMS
Transport Management System: transport optimization — carrier choice, routing, shipment tracking, freight-invoice control.
Total quality dashboard (KPI dashboard)
One monthly page: 5-10 indicators with value, trend, target, variance comment — each indicator has an owner and triggers decisions.
Turnover ratio
See "Rotation": annual consumption ÷ average stock, judged in trend and comparison, always paired with service level.
Freight forwarder
An organizer of international transport: mode choice, groupage, documents, customs, insurance — buys freight wholesale and secures formalities.
CQD triangle (cost-quality-lead time)
Cost, quality, lead time: the three demands of any purchase, impossible to maximize at once — buying means consciously arbitrating between them.
Value need (right-sizing)
A specification level that covers real use — neither under-sized (risk) nor over-sized (a permanent extra cost for unused performance).
Weighting
The weight given to each criterion (price, quality, lead time, services) per the purchase's criticality; a fundamental decision that pre-determines the choice.
WMS
Warehouse Management System: fine steering of the warehouse (locations, picking paths, waves, scanning, cycle counting) — the detail the ERP ignores.
Zoning
Dividing the warehouse into flow-dedicated zones: receiving, storage, picking, packing, shipping — with a flow that crosses without backtracking (I- or U-shaped).
Annual full inventory
An exhaustive periodic count (often at year-end), mainly for accounting; precise obligations vary by country — a useful snapshot but poor for management.
Cycle counting (rolling inventory)
Continuous counting in small portions (A items several times a year, C items once); detects errors near their cause, without stopping activity.
Delivery note (DN)
The document accompanying the goods listing what is actually delivered; the basis for receipt checking, to reconcile with the PO and the invoice.
Late penalties
Sums owed by the supplier if the contractual deadline is missed; realistic and applied, they make the deadline credible — spectacular and ignored, they protect nothing.
Lot traceability
See "Batch traceability": recording the batch at each step to enable a targeted recall.
Best value / lowest bid
Lowest bid: the offer at the lowest price. Best value: the best overall offer per the weighted criteria — the goal of a professional purchase.