Level 4 exam — harder

Exam — fresh questions

4.1 · Recall

1. What does the severity × frequency × regulation matrix name?

It ranks aspects (air, water, soil, noise, waste) to focus action — same logic as risks.
4.1 · Application

2. Hakim sets up his workshop in another country. What about the French ICPE regime?

Permit-limit-inspect everywhere; permits, thresholds and counters per country — check with the administration.
4.1 · Arbitration

3. Inspection tomorrow, no requirements register kept. Which verdict?

An up-to-date register turns inspection into verification; without it, each gap becomes a fault.
4.2 · Application

4. Site already 9001 certified: how do you add 14001?

Same HLS backbone: merge duplicates instead of stacking binders — road to QSE.
4.2 · Arbitration

5. “We sort our bins, so we have a 14001 EMS”. What do you answer?

Sorting is a gesture; 14001 manages purchasing, production, transport and end of life with proven trajectory.
4.2 · Application

6. What does a 14001 auditor check first on objectives?

Quantified, dated objectives tracked at review: an analysed miss beats a vague hit.
4.3 · Recall

7. What ranks first in the waste hierarchy?

Prevent, then reuse, recycle, recover — dispose as last resort.
4.3 · Application

8. Hakim finds solvents mixed with cardboard, no slip. How serious?

Hazardous waste never mixed: specialist channels, traceability from producer to disposer.
4.3 · Arbitration

9. A third of sorting bins is wrong every week. What do you decide?

Audit bins before blaming: visible instructions, posted weighings, 5-minute brief.
4.4 · Application

10. Hakim's compressed-air bill soars. First move?

Sober then efficient then renewable: free (leaks) before invested.
4.4 · Arbitration

11. Hakim wants to offset emissions without cutting any. What do you tell him?

Climate order: reduce, decarbonise, offset last and cautiously — never the reverse.
4.5 · Application

12. 30 CSR ideas, no budget: how does Hakim decide?

Stakeholders × impacts: wanting to do everything does nothing — quantified plan then public report.