Level 0 exam — harder

Exam — fresh questions

0.1 · Recall

1. What does Microsoft Project let you do?

Project plans (tasks, durations, dependencies), assigns (resources, costs) and tracks progress, all in a Gantt chart.
0.1 · Application

2. Meriem hesitates between Project, Planner and Excel for a structured site. What does she choose?

A structured project (linked tasks, resources, budget, critical path) is driven in Project desktop, not in a spreadsheet or in Planner.
0.1 · Arbitration

3. A task slips by three days. Why does Meriem prefer Project to Excel?

Project automatically propagates the impact of a delay onto the following tasks and onto the critical path; Excel forces you to touch up the dates by hand.
0.2 · Recall

4. Which desktop edition of Project allows shared resources and server connection?

Project Professional adds the resource pool, the Team Planner and the connection to Project Online/Server; Standard remains solo planning.
0.2 · Application

5. Meriem wants Project Professional on the desktop and the web version. Which plan does she target?

Plan 3 includes Project Professional (desktop) + Project for the web; Plan 1 is limited to the web and Plan 5 adds the portfolio.
0.2 · Arbitration

6. Meriem's company already has an M365 subscription. What reflex before buying Project?

Checking the existing subscription avoids a double purchase: an M365 subscription may already include Project.
0.3 · Recall

7. How do you enter tasks in the Gantt Chart view?

You enter data on the left in the task grid (name, duration, dates, predecessors) and visualize on the right the bars on the timescale.
0.3 · Application

8. Meriem wants to see her teams' overallocations. Which view does she open?

Each view answers a question: the resource graph is precisely used to reveal overallocations.
0.3 · Arbitration

9. The schedule looks unreadable, too zoomed in. What does Meriem do?

The timescale is set to zoom in on detail or step back: that is the right lever, without touching the tasks.
0.4 · Recall

10. What does the project calendar define?

The calendar defines the working days/hours, the weekends and the holidays; it serves as the basis for calculating all durations.
0.4 · Application

11. Meriem wants weekends and public holidays to be non-working. Where does she act?

You customize hours, weekends and leave via Project > Change Working Time (the project calendar).
0.4 · Arbitration

12. A 5-day task must finish on a Friday but Project places it later. What does Meriem infer?

Durations are calculated in working days: a misdeclared weekend or holiday shifts the finish date. The calendar must be corrected.